Irrigation
The total geographical area of the district is 180900 hectares & out of that 51.52 % is cultivable area. The district receives total rainfall in between 2800-3200 mm per year and more than 70% received during 7 months via, April to October. Summer (Boro rice) paddy and vegetable crops are mainly grown in Beels and Haor situation and low lying area. In winter season crops suffer from water stress and require irrigation. Even higher rainfall areas needed irrigations at critical stages. There is a significantly gap between the potential irrigated area & actual irrigated areas. The total cultivable area of the district is 93206 hectares and out of it 2.53% is actually irrigated remaining 96.40 % is rain-fed.
Irrigation is mostly done by utilizing surface water in the district. During the year 2007-08, the surface water irrigates 98% of the total irrigation. Ground water irrigates only 2% of the total Irrigation which shows that the ground water utilization is negligible for irrigation in the district. Ground water developed for irrigation purpose is through deep and shallow tube wells fitted with pump sets. As on 31.03.2008, there are 19 lift irrigation schemes, 1 flow irrigation scheme, 17 CTW and 385 STW in the district, most of the minor irrigation sources are not in use.
PMKSY-HKKP- TUBE WELL SCHEMES FOR THE YEAR 2020-2021
PHYSICAL PROGRESS :: PMKSY-HKKP- TUBE WELL SCHEMES FOR THE YEAR 2020-2021 (PH-II), |
|||||||||||||||
Sl. No. |
Name of District |
Name of Division |
Name of alloted LAC |
LAC WISE NO. OF TW ALLOTED |
NO. OF BORING AND DEVELOPING COMPLEED |
INSTALLATION OF PUMPs (Nos) |
Installation of Solar Panel |
ELECTRIC CONECTIONS (NOS) |
Physical progress IN % |
||||||
SOLAR |
ELECT. |
TOTAL |
SOLAR |
ELECT. |
TOTAL |
SOLAR |
ELECT. |
TOTAL |
|||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
6 |
Karimganj |
Karimganj North- Karimganj South-Badarpur Division |
North Karimganj |
23 |
65 |
88 |
23 |
65 |
88 |
23 |
65 |
88 |
23 |
65 |
100.00% |
South Karimganj |
23 |
58 |
81 |
23 |
58 |
81 |
23 |
58 |
81 |
23 |
58 |
100.00% |
|||
Badarpur |
23 |
63 |
86 |
23 |
63 |
86 |
23 |
63 |
86 |
23 |
63 |
100.00% |
PRESENT STATUS OF ONGOING SCHEMES
PRESENT STATUS OF ONGOING SCHEMES UPTO December, 2022 |
|||||||||||
Sl. |
Name of Division |
Name of District |
Name of Scheme |
Estimated Cost (A.A.Amount)(Rs. In Lakhs) |
Estimated Potential (in Hectare) |
Time of Completion |
Physical progress |
Fund Received (Rs. in Lakhs) |
Fund Utilised (Rs in Lakhs) |
Potential created (in Hect.) |
Remarks |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
1 |
Ratabari- Patharkandi Division (Irrigation) Patharkandi |
Karimganj |
Tubewell schemes under PMKSY-HKKP Ph-II of Ratabari LAC (112 Electrical + 38 Solar= 150 pts.) |
890.28 |
600 H |
September /2022 |
100% |
467.68442 |
467.68442 |
600 |
Boring, Development and installation of pumps of 112 nos. of Electrically operated STW schemes along with 38 nos of Solar schrmes have been completed. |
2 |
Tubewell schemes under PMKSY-HKKP Ph-II of Patharkandi LAC (112 Electrical + 38 Solar= 150 pts.) |
890.28 |
600 H |
September /2022 |
100% |
525.63017 |
525.63017 |
600 |
Boring, Development and installation of pumps of 112 nos. of Electrically operated STW schemes along with 38nos of Solar schrmes have been completed. |
||
3 |
Khakragolcherra FIS under SOPD for the year 2020-21 |
199.65 |
80 H |
January/ 2024 |
14% |
Nil |
Nil |
Nil |
|
||
4 |
Mandritilla cherra FIS under SOPD for the year 2020-21 |
199.00 |
80 H |
January/ 2024 |
20% |
Nil |
Nil |
Nil |
|
||
5 |
Kantanala cherra FIS under SOPD for the year 2020-21 |
199.88 |
80 H |
January/ 2024 |
15% |
Nil |
Nil |
Nil |
|
||
6 |
Piplapunji cherra FIS (AIBP) |
989.20 |
710 H |
Dec/2022 |
62% |
320.00 |
320.00 |
Nil |
Steps are being taken to complete the scheme by March/2023. |
||
7 |
Maguracherra F.I.S. (A.I.B.P.) |
495.00 |
380 H |
Dec/2022 |
90% |
421.494 |
401.346 |
Nil |
Steps are being taken to complete the scheme by March/2023. |
||
8 |
|
|
Borbari F.I.S. (A.I.B.P.) |
196.96 |
140 H |
Dec/2022 |
98% |
181.27 |
181.27 |
140 H |
The work of canal is yet to be taken up due to court case of contractor for payment issue. |
9 |
Ratabari- Patharkandi Division (Irrigation) Patharkandi |
Karimganj |
Rupacherra F.I.S. (A.I.B.P.) |
476.00 |
300 H |
Dec/2022 |
60% |
245.219 |
245.219 |
Nil |
Cross regulator gate yet to be installed by the contractor. In the meeting on 27.05.2022 at C.E.'s office the it is decided to foreclose the scheme. |
10 |
Fanaicherra F.I.S. (A.I.B.P.) |
476.00 |
350 H |
Dec/2022 |
100% |
468.51 |
428.924 |
nil |
The works of Phase-1 has been completed but the scheme is non functional because another 1000m of canal is required.Proposal for construction of the same is under process. |
||
11 |
Gambhiracherra F.I.S. (A.I.B.P.) |
496.00 |
400 H |
Dec/2022 |
92% |
447.925 |
447.925 |
Nil |
In the meeting on 27.05.2022 at C.E.'s office the it is decided to foreclose the scheme. |
||
12 |
Shinglacherra F.I.S. (A.I.B.P.) |
495.00 |
380 H |
Dec/2022 |
95% |
468.656 |
468.656 |
Nil |
Steps are being taken to complete the scheme by March/2023. |
||
13 |
Burungacherra F.I.S. (A.I.B.P.) |
476.00 |
400 H |
Dec/2022 |
100% |
451.359 |
451.359 |
Nil |
Completed |
||
14 |
Tuilengtacherra F.I.S. (A.I.B.P.) |
498.00 |
380 H |
Dec/2022 |
95% |
460.232 |
460.232 |
Nil |
Steps are being taken to complete the scheme by March/2023. |