The total geographical area of the district is 180900 hectares & out of that 51.52 % is cultivable area. The district receives total rainfall in between 2800-3200 mm per year and more than 70% received during 7 months via, April to October. Summer (Boro rice) paddy and vegetable crops are mainly grown in Beels and Haor situation and low lying area. In winter season crops suffer from water stress and require irrigation. Even higher rainfall areas needed irrigations at critical stages. There is a significantly gap between the potential irrigated area & actual irrigated areas. The total cultivable area of the district is 93206 hectares and out of it 2.53% is actually irrigated remaining 96.40 % is rain-fed.

Irrigation is mostly done by utilizing surface water in the district. During the year 2007-08, the surface water irrigates 98% of the total irrigation. Ground water irrigates only 2% of the total Irrigation which shows that the ground water utilization is negligible for irrigation in the district. Ground water developed for irrigation purpose is through deep and shallow tube wells fitted with pump sets. As on 31.03.2008, there are 19 lift irrigation schemes, 1 flow irrigation scheme, 17 CTW and 385 STW in the district, most of the minor irrigation sources are not in use.

PMKSY-HKKP- TUBE WELL SCHEMES FOR THE YEAR 2020-2021

PHYSICAL PROGRESS :: PMKSY-HKKP- TUBE WELL SCHEMES FOR THE YEAR 2020-2021 (PH-II),
STATUS AS ON 31/12/2022

Sl. No.

Name of District

Name of Division

Name of alloted LAC

LAC WISE NO. OF TW ALLOTED
                                 (Nos.)

NO. OF BORING AND DEVELOPING  COMPLEED

INSTALLATION OF PUMPs (Nos)

Installation of Solar Panel

ELECTRIC CONECTIONS (NOS)

Physical progress IN %

SOLAR

ELECT.

TOTAL

SOLAR

ELECT.

TOTAL

SOLAR

ELECT.

TOTAL

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

6

Karimganj

Karimganj North- Karimganj South-Badarpur Division

North Karimganj

23

65

88

23

65

88

23

65

88

23

65

100.00%

South Karimganj

23

58

81

23

58

81

23

58

81

23

58

100.00%

Badarpur

23

63

86

23

63

86

23

63

86

23

63

100.00%

 

PRESENT STATUS OF ONGOING SCHEMES

PRESENT STATUS OF ONGOING SCHEMES UPTO December, 2022

Sl.
No

Name of Division

Name of District

Name of Scheme

Estimated Cost

(A.A.Amount)(Rs. In Lakhs)

Estimated Potential (in Hectare)

Time of Completion

Physical progress

Fund Received (Rs. in Lakhs)

Fund Utilised (Rs in Lakhs)

Potential created (in Hect.)

Remarks

1

2

3

4

5

6

7

8

9

10

11

12

1

Ratabari- Patharkandi

Division (Irrigation)

Patharkandi

Karimganj

Tubewell schemes under PMKSY-HKKP Ph-II of Ratabari LAC (112 Electrical + 38 Solar= 150 pts.)

890.28

600 H

September    /2022

100%

467.68442

467.68442

600

Boring, Development and installation of pumps of 112 nos. of Electrically operated STW schemes along with 38 nos of Solar schrmes have been completed.

2

Tubewell schemes under PMKSY-HKKP Ph-II of Patharkandi LAC (112 Electrical + 38 Solar= 150 pts.)

890.28

600 H

September    /2022

100%

525.63017

525.63017

600

Boring, Development and installation of pumps of 112 nos. of Electrically operated STW schemes along with 38nos of Solar schrmes have been completed.

3

Khakragolcherra FIS under SOPD for the year 2020-21

199.65

80 H

January/ 2024

14%

Nil

Nil

Nil

 

4

Mandritilla cherra FIS under SOPD for the year 2020-21

199.00

80 H

January/ 2024

20%

Nil

Nil

Nil

 

5

Kantanala cherra FIS under SOPD for the year 2020-21

199.88

80 H

January/ 2024

15%

Nil

Nil

Nil

 

6

Piplapunji cherra FIS (AIBP)

989.20

710 H

Dec/2022

62%

320.00

320.00

Nil

Steps are being taken to complete the scheme by March/2023.

7

Maguracherra F.I.S.  (A.I.B.P.)

495.00

380 H

Dec/2022

90%

421.494

401.346

Nil

Steps are being taken to complete the scheme by March/2023.

8

 

 

Borbari F.I.S.  (A.I.B.P.)

196.96

140 H

Dec/2022

98%

181.27

181.27

140 H

The work of canal  is yet to be taken up due to court case of contractor for payment issue.

9

Ratabari- Patharkandi

Division (Irrigation)

Patharkandi

Karimganj

Rupacherra F.I.S. (A.I.B.P.)

476.00

300 H

Dec/2022

60%

245.219

245.219

Nil

Cross regulator gate yet to be installed by the contractor. In the meeting on 27.05.2022 at C.E.'s office the it is decided to foreclose the scheme. 

10

Fanaicherra F.I.S.  (A.I.B.P.)

476.00

350 H

Dec/2022

100%

468.51

428.924

nil

The works of Phase-1 has been completed but the scheme is non functional because another 1000m of canal is required.Proposal for construction of the same is under process.

11

Gambhiracherra F.I.S.  (A.I.B.P.)

496.00

400 H

Dec/2022

92%

447.925

447.925

Nil

In the meeting on 27.05.2022 at C.E.'s office the it is decided to foreclose the scheme.

12

Shinglacherra F.I.S.  (A.I.B.P.)

495.00

380 H

Dec/2022

95%

468.656

468.656

Nil

Steps are being taken to complete the scheme by March/2023.

13

Burungacherra F.I.S.  (A.I.B.P.)

476.00

400 H

Dec/2022

100%

451.359

451.359

Nil

Completed

14

Tuilengtacherra F.I.S.  (A.I.B.P.)

498.00

380 H

Dec/2022

95%

460.232

460.232

Nil

Steps are being taken to complete the scheme by March/2023.